damarket Our Motto:
Viewed : 27049
Select Language
ENGLISH | | PERSIAN
Viewed 27049
Price: To be negotiated
Demir Sun towel radiator model 15 tubes Demir Sun towel radiator model 15 tubes
Exporter, Wholesale, Manufacturer
Tehran
+989122003350
damamarket@gmail.com
Price: 14.00 USD
  • Price :14.00 USD

Demir Sun towel radiator model 15 tubes , Iran

The Demir Sun towel radiator model 15 tubes combines modern aesthetics with functional design, built from stainless steel featuring a 1.2 mm tube thickness. It consists of 15 horizontal tubes with a 25 mm diameter, connected to two corrosion-resistant vertical collectors. The working pressure is 8 bar, and the test pressure is 10 bar, ensuring safe and reliable operation in heating systems. Its nominal heat output under 75/65/20°C conditions is approximately 440 watts. The RAL9016 white electrostatic powder coating provides excellent resistance to humidity, steam, and rust. Its lightweight, balanced structure allows for easy installation in small to medium bathrooms.

The Demir Sun 15-tube model measures approximately 90 cm in height, 50 cm in width, and weighs about 6.5 kg. The 1/2-inch inlet and outlet fittings are located at the bottom, allowing left or right installation flexibility. Even spacing between the tubes improves heat circulation and enables fast towel drying. Manufactured according to the European EN442 standard, this radiator ensures high efficiency, silent performance, and long service life, making it an ideal and durable choice for residential and humid environments.You can order and buy Demir Sun towel radiator model 15 tubes from Iran by contacting us through whatsaap and email.
WEBSITE: Demir Sun towel radiator model 15 tubes Iran

Demir Sun towel radiator model 15 tubes

Installation Guide for Demir Sun 15-Tube Towel Radiator

Installing the Demir Sun 15-tube towel radiator must follow EN442 standards and maintain proper height from the floor for optimal heat output. The ideal mounting height is 20 to 30 cm above the floor and at least 10 cm below the ceiling. First, the bracket positions are measured and leveled, then fixed to the wall using 8 mm wall plugs. After placing the radiator on the brackets, the 1/2-inch inlet and outlet connections are sealed and installed. Next, the air vent valve is opened and the system is filled slowly to ensure complete air removal. Finally, the system pressure is adjusted to 1–1.5 bar, and the heating performance is checked for any leaks or temperature drops.

I N F O @ N A N O T E J A R A T . C O M | 0 9 1 2 5 0 3 0 0 7 1
Nanotejarat, Iranian industrial database

© Copyright 2025 - All rights reserved